Ground adaptation in durable feedback, predictive planning and audited evaluation by ruvnet · Pull Request #2 · ruvnet/rGi · GitHub
Skip to content

Ground adaptation in durable feedback, predictive planning and audited evaluation - #2

Merged
ruvnet merged 1 commit into
mainfrom
feat/grounded-adaptation
Sep 8, 2026
Merged

ruvnet merged 1 commit into
mainfrom
feat/grounded-adaptation

Conversation

@ruvnet

@ruvnet ruvnet commented Sep 8, 2026

Copy link
Copy Markdown
Owner

The initial supervisor persisted work but did not supply execution outcomes to subsequent planning or control repeated candidate evaluation. This adds research-informed mechanisms for measurable adaptation while retaining host policy and budget authority.

Changes:

  • Bounded durable execution feedback and observation freshness checks.
  • Atomic planner checkpoints with queued actions; failed planning requires a fresh instance.
  • Bounded predictive beam search through an injected dynamics model.
  • A scalar simulation planner connecting feedback, online dynamics and action selection.
  • Paired evaluation with disjoint manifests, retention/cost checks and a durable audit ledger with fixed statistical spending.
  • Eight-source research review, migration instructions and replayable benchmark evidence.

Validation: all 13 strict harness checks passed, including 67 TypeScript tests, Rust tests, native/WASM builds and execution parity, benchmarks and npm/Cargo advisory checks. Evidence and tested source hashes are in evidence/grounded-adaptation.

The fixed simulation benchmark completed 120/120 cases with adaptation versus 80/120 with a frozen baseline. Both received 128 calibration interactions per regime and were frozen during audit. Gains came from reversed scalar dynamics; the other two regimes retained 40/40 each. The nominal paired p-value is diagnostic because shared fitted models can correlate outcomes. No deployed model was promoted.

Limitations: this is one synthetic task family, not AGI, independent unseen-domain transfer or demonstrated SOTA performance. No multimodal foundation model training, JitRL logit updates or MemHarness GRPO training is implemented. Schema 1 journals must be stopped before migration to schema 2; old completed jobs are not backfilled into feedback.

@ruvnet
ruvnet merged commit 2dd6adb into main Sep 8, 2026
2 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant