fix(security): resolve pnpm audit failures from 2026-09-04 audit by cursor[bot] · Pull Request #4530 · firecrawl/firecrawl · GitHub
Skip to content

fix(security): resolve pnpm audit failures from 2026-09-04 audit - #4530

Open
cursor[bot] wants to merge 1 commit into
mainfrom
security/audit-fixes-2026-09-04
Open

fix(security): resolve pnpm audit failures from 2026-09-04 audit#4530
cursor[bot] wants to merge 1 commit into
mainfrom
security/audit-fixes-2026-09-04

Conversation

@cursor

@cursor cursor Bot commented Sep 4, 2026

Copy link
Copy Markdown
Contributor

Summary

Fixed:

  • apps/test-suite: artillery 2.0.332.0.34 fixes GHSA-px8p-9vwx-vf98

Deferred:

  • GHSA-v2v4-37r5-5v8g / ip-address in apps/api: blocked | temp-ignore
    • Reason: latest geoip-country still depends on ip-address 6.x; the patched line is 10.x, a multi-major jump that is not safe to override without compatibility approval. Existing allowlist in apps/api/audit-ci.jsonc remains (expires 2026-09-23).
    • Next action: waiting on upstream; needs approval for a major-crossing compatibility investigation or package replacement
    • Tracking: create internal ticket
  • GHSA-mwp4-54f8-5fhr / ip-address in apps/api: blocked | temp-ignore
    • Reason: same dependency chain and blocker as above.
    • Next action: waiting on upstream; needs approval for a major-crossing compatibility investigation or package replacement
    • Tracking: create internal ticket

Verification:

  • CI-equivalent audit: passed with approved deferment
Open in Web View Automation 

Summary by cubic

Updates artillery to 2.0.34 in apps/test-suite to fix GHSA-px8p-9vwx-vf98 and clear the 2026-09-04 pnpm audit failure.

Deferred

  • GHSA-v2v4-37r5-5v8g and GHSA-mwp4-54f8-5fhr remain deferred in apps/api because geoip-country depends on ip-address 6.x and the patched line is 10.x.
  • The allowlist in apps/api/audit-ci.jsonc stays until 2026-09-23, and a tracking ticket will be created for the upstream blocker.
  • The CI-equivalent audit passes with the approved deferment.

Written for commit 6bf4890. Summary will update on new commits.

Review in cubic

Co-authored-by: Abimael Martell <abimaelmartell@users.noreply.github.com>
@abimaelmartell
abimaelmartell marked this pull request as ready for review September 4, 2026 14:27
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants