Skip to content
Navigation Menu
{{ message }}
-
Notifications
You must be signed in to change notification settings - Fork 253
Pull requests: adobe/spectrum-web-components
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
ci: notify slack when checks fail after merging to main
run_vrt
Triggers the Chromatic VRT run for 2nd-gen
Status:Ready for review
PR ready for review or re-review.
#6453
opened Jun 25, 2026 by
pfulton
Collaborator
Loading…
1 of 2 tasks
feat(tokens): upgrade @adobe/spectrum-tokens to 14.13.1 with automated token CSS fix tooling
2nd gen
These issues or PRs map to our 2nd generation work to modernizing infrastructure.
Component:Tooling
Issue or PR dealing with scripts, workflows, automation, etc. Component prefix is for Jira
run_vrt
Triggers the Chromatic VRT run for 2nd-gen
Status:Ready for merge
PR has 2 approvals, all tests pass, and is ready to merge
#6451
opened Jun 24, 2026 by
5t3ph
Contributor
Loading…
feat(core): migrate ColorController to 2nd-gen and optimize with colorjs.io
2nd gen
These issues or PRs map to our 2nd generation work to modernizing infrastructure.
Status:Ready for review
PR ready for review or re-review.
#6450
opened Jun 24, 2026 by
blunteshwar
Contributor
Loading…
3 of 16 tasks
chore(dropzone): test suites
Component:Dropzone
Spectrum 2
Issues related to Spectrum 2
Status:Blocked
PR is blocked for some reason
#6448
opened Jun 23, 2026 by
cdransf
Member
Loading…
5 of 18 tasks
docs(thumbnail): accessibility migration analysis
a11y
Issues or PRs related to accessibility
High priority PR review
PR is a high priority and should be reviewed ASAP
Status:Ready for review
PR ready for review or re-review.
#6447
opened Jun 23, 2026 by
nikkimk
Contributor
Loading…
4 of 22 tasks
chore(dropzone): full fidelity
Component:Dropzone
Spectrum 2
Issues related to Spectrum 2
Status:Blocked
PR is blocked for some reason
#6446
opened Jun 23, 2026 by
cdransf
Member
Loading…
3 of 20 tasks
chore(actiongroup): file structure, api, a11y setup
2nd gen
These issues or PRs map to our 2nd generation work to modernizing infrastructure.
Component:Action group
Status:WIP
PR is a work in progress or draft
#6445
opened Jun 23, 2026 by
rise-erpelding
Collaborator
•
Draft
17 tasks
feat(actiongroup): migrate action group
2nd gen
These issues or PRs map to our 2nd generation work to modernizing infrastructure.
Component:Action group
Status:WIP
PR is a work in progress or draft
#6444
opened Jun 23, 2026 by
rise-erpelding
Collaborator
•
Draft
1 of 24 tasks
feat(color-handle): scaffold 2nd-gen core/SWC structure (Phase 2)
ready-for-review
#6443
opened Jun 23, 2026 by
blunteshwar
Contributor
Loading…
2 of 17 tasks
docs(toast): accessibility migration analysis
a11y
Issues or PRs related to accessibility
High priority PR review
PR is a high priority and should be reviewed ASAP
Status:Ready for review
PR ready for review or re-review.
#6442
opened Jun 23, 2026 by
nikkimk
Contributor
Loading…
3 of 17 tasks
docs(infield-button): add Phase 1 migration plan
Spectrum 2
Issues related to Spectrum 2
Status:Ready for review
PR ready for review or re-review.
#6441
opened Jun 23, 2026 by
Rajdeepc
Contributor
Loading…
1 task
feat(button): extract pending state into reusable core primitives
High priority PR review
PR is a high priority and should be reviewed ASAP
Status:Addressing feedback
PR owner is addressing review comments and will change label back to "Ready for review" when ready.
#6439
opened Jun 22, 2026 by
caseyisonit
Contributor
Loading…
5 of 18 tasks
chore(dropzone): S2 migration
Component:Dropzone
do-not-merge
NO MERGE-Y!
Spectrum 2
Issues related to Spectrum 2
docs: fix broken shared CSS link and color loupe test meta path
#6434
opened Jun 22, 2026 by
rubencarvalho
Contributor
Loading…
2 of 4 tasks
ci: split preview-docs workflow to support fork contributor PRs
Component:Tooling
Issue or PR dealing with scripts, workflows, automation, etc. Component prefix is for Jira
docs(popover): phase 7 — per-component MDX + section stories
Status:Ready for review
PR ready for review or re-review.
#6427
opened Jun 19, 2026 by
rubencarvalho
Contributor
Loading…
2 tasks
test(popover): phase 6 — behavior, util, and a11y coverage
Status:Ready for review
PR ready for review or re-review.
#6426
opened Jun 19, 2026 by
rubencarvalho
Contributor
Loading…
2 tasks
fix(menu): Use package import for sp-menu-divider registration
Contribution
PRs from contributors
run_vrt
Triggers the Chromatic VRT run for 2nd-gen
Status:Ready for review
PR ready for review or re-review.
#6420
opened Jun 18, 2026 by
Govind-gupta75
Loading…
17 tasks
feat(icon): make swc-icon public with BYO SVG docs and private elements catalog
2nd gen
These issues or PRs map to our 2nd generation work to modernizing infrastructure.
Component:Icon
run_vrt
Triggers the Chromatic VRT run for 2nd-gen
Status:Ready for review
PR ready for review or re-review.
#6415
opened Jun 17, 2026 by
TarunAdobe
Contributor
Loading…
7 of 21 tasks
feat(close-button): migrate to 2nd-gen
run_vrt
Triggers the Chromatic VRT run for 2nd-gen
Status:Ready for review
PR ready for review or re-review.
#6410
opened Jun 16, 2026 by
TarunAdobe
Contributor
Loading…
6 of 20 tasks
ci: add 2nd-gen-only beta publish scope to publish workflow
#6406
opened Jun 15, 2026 by
Rajdeepc
Contributor
Loading…
3 of 9 tasks
feat(core): selection controller
High priority PR review
PR is a high priority and should be reviewed ASAP
Status:Ready for review
PR ready for review or re-review.
#6402
opened Jun 12, 2026 by
nikkimk
Contributor
Loading…
16 tasks
Previous Next
ProTip!
Type g i on any issue or pull request to go back to the issue listing page.
You can’t perform that action at this time.
